|
Issue |
Title |
|
Vol 4, No 1 (2019): Journals Mining Engineering: Bina Tambang |
ANALISIS SUMBERDAYA TERUNJUK BATU ANDESIT MENGGUNAKAN METODE CROSS SECTION DAN METODE TRIANGULAR DI PT. BINTANG SUMATERA PASIFIK, KECAMATAN PANGKALAN KOTO BARU, KABUPATEN LIMA PULUH KOTA, PROVINSI SUMATERA BARAT |
Abstract
PDF
|
Refky Adi Nata, Rizky Edra Suryadi |
|
Vol 4, No 2 (2019): Journals Mining Engineering: Bina Tambang |
ANALISIS TENAGA KERJA TERHADAP KEGIATAN SEKTOR EKONOMI DALAM PERENCANAAN KOTA KABUPATEN KARIMUN |
Abstract
PDF
|
Tri Gamela Saldy, Dina Fara Waidah, Tiuridah Silitonga, Panji Pangestu |
|
Vol 7, No 1 (2022): Journals Mining Engineering: Bina Tambang |
Analisis Waktu pengerukan Check Dam Timur Terhadap Laju Erosi di Das Timur Tambang Batu Kapur PT Semen Padang |
Abstract
PDF (Bahasa Indonesia)
|
Tomi Suprianto Simatupang, Raimon Kopa |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Analysis Match Factor Loader and Hauler for Activities Overburden Removal Using the Queue Method at PT. Andalan Artha Primanusa Jobsite PT. Budi Gema Gempita, South Sumatera Province |
Abstract
PDF
|
Rahmad Fikri, Mulya Gusman |
|
Vol 3, No 1 (2018): Journals Mining Engineering: Bina Tambang |
Analysis Of JHA, JSA and Management K3 At KIP 16 Bangka Ocean Mining Units PT Timah (Persero) Tbk Province Bangka Belitung Islands |
Abstract
PDF
|
Riri Rahmahwati Joni, Rusli HAR, Heri Prabowo |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Analysis of Slope Stability in the Coal Mining Area of KUD Sinamar Sakato, Jorong Sinamar, Nagari Sinamar, Asam Jujuhan, Dharmasraya, West Sumatera |
Abstract
PDF
|
Dimas Agung Hermawan.HL, Yoszi Mingsi Anaperta, Heri Prabowo, Sultan Muhammad Taufik |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Analysis of the Effect of Production on Investment in Digging - Loading and Transport Equipment PT. Y in Block 8 of PT X Limestone Mining, South Sulawesi Province |
Abstract
PDF
|
Muhammad Fikra Irwan, Tri Gamela Saldy |
|
Vol 6, No 2 (2021): Journals Mining Engineering: Bina Tambang |
Aplikasi Metode Job Safety Analysis Dan Pendekatan HIRADC Untuk Analisis Risiko Keselamatan Dan Kesehatan Kerja Pada Penambangan Bawah Tanah Bijih Emas Pt. Dempo Maju Cemerlang Pesisir Selatan |
Abstract
PDF
|
Nia Kurniasih, Fadhilah Fadhilah, Andri Prihatanto |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Assessment of Productivity and Compatibility of Komatsu PC 2000 Loader and Komatsu HD 785 Transport Equiptment in Overburden Stripping Activities in the North Pit of Muara Tiga Besar Mining Area at PT. Bukit Asam, Tbk. Tanjung Enim, South Sumatra |
Abstract
PDF
|
Putra Alfarizi, Heri Prabowo |
|
Vol 2, No 1 (2015): Journals Mining Engineering: Bina Tambang |
BIAYA PRODUKSI ALAT MUAT DAN ALAT ANGKUT PADA KEGIATAN PENGUPASAN OVERBURDEN PENAMBANGAN BATUBARA DI PT. KARBINDO ABESYAPRADHI |
Abstract
PDF
|
Toni Mayyondra, Murad Murad, Fadhilah Fadhilah |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Calculation of Coal Resources Using the Circular Method at PT Manggala Alam Lestari Bayung Lencir |
Abstract
PDF
|
Rolitu Rolitu, Mulya Gusman |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Calculation of Runoff Discharge in the Coal Mining Open Pit Mine Conveyance System at PT. Kalimantan Prima Persada Jobsite PELH Kebur Village, West Merapi District, Lahat Regency, South Sumatra Province |
Abstract
PDF
PDF
|
Fajar Rofiescha, Rusli HAR, Heri Prabowo |
|
Vol 3, No 1 (2018): Journals Mining Engineering: Bina Tambang |
Characteristic Analysis of Coal Oil Mixture as Alternative Diesel Fuel from Low Rank Coal at PT.Nusa Alam Lestari Site Sinamar Dharmasraya Sumatera Barat |
Abstract
PDF
|
Deni Syahputra, Rijal Abdullah, Yunasril Yunasril |
|
Vol 6, No 2 (2021): Journals Mining Engineering: Bina Tambang |
Deashing Pada Batubara Menggunakan KOH dan HNO3 Sebagai Leaching Agent |
Abstract
PDF
|
Hendly Syahputra Pratama, Fadhilah Fadhilah |
|
Vol 8, No 2 (2023): Journals Mining Engineering: Bina Tambang |
Desain Dan Penjadwalan Produksi Pit Tambang Batubara CV. Niska, Dusun Senamat, Kecamatan Pelepat, Kabupaten Bungo, Provinsi Jambi |
Abstract
PDF (Bahasa Indonesia)
|
Yudha Kurnia Isti |
|
Vol 8, No 1 (2023): Journals Mining Engineering: Bina Tambang |
Desain Optimalisasi dan Penjadwalan Produksi Penambangan Batubara Pada Pit Granit Extend Seam 6 PT. Cipta Bersama Sukses Desa Beji Mulyo Provinsi Sumatera Selatan |
Abstract
PDF (Bahasa Indonesia)
|
Ravilqi Medri, Mulya Gusman |
|
Vol 9, No 2 (2024): Journals Mining Engineering: Bina Tambang |
Desain Penimbunan dan Biaya Penimbunan in Pit Dump X PT Pengembangan Investasi Riau, Desa Pematang Benteng, Kabupaten Indragiri Hulu, Riau |
Abstract
PDF (Bahasa Indonesia)
|
Rahma Shabrina Lubis, Heri Prabowo |
|
Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang |
Desulfurisasi Batubara dengan Metode Leaching Menggunakan Pelarut Asam Klorida (HCl) |
Abstract
PDF
|
Syafril Maidi, Yunasril Yunasril |
|
Vol 6, No 2 (2021): Journals Mining Engineering: Bina Tambang |
Efektifitas Pemanfaatan Sumur Resapan dan Biopori sebagai Artificial Recharge untuk Meresapkan Air Hujan ke dalam Lapisan Akuifer Dangkal pada DAS Batang Kuranji Kota Padang |
Abstract
PDF
|
Alviansyah Alviansyah, Rusli HAR |
|
Vol 9, No 2 (2024): Journals Mining Engineering: Bina Tambang |
Effect of Water and Chemical Spray on Quality Parameters TM, Ash, and CV of E4700 Product Coal at PT Adaro Indonesia Site Kelanis, South Barito Regency, Central Kalimantan |
Abstract
PDF
|
Rinaldi Suntana, Heri Prabowo |
|
Vol 4, No 2 (2019): Journals Mining Engineering: Bina Tambang |
Efisiensi Produktivitas Peralatan Tambang Untuk Mencapai Target Produksi Area (412 Ha) PT. Semen Padang (Persero) Tbk |
Abstract
PDF
|
Hendra Pratama, Murad Murad |
|
Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang |
Estimasi Biaya dan Evaluasi Kebutuhan Alat Muat dan Alat Angkut Terhadap Efisiensi Penambangan Batubara pada Tambang Terbuka PT. Allied Indo Coal Jaya, Sawahlunto |
Abstract
PDF
|
Nurul Anisa Ardianti, Heri Prabowo |
|
Vol 8, No 1 (2023): Journals Mining Engineering: Bina Tambang |
Estimasi Cadangan Batubara PT. Pancaran Surya Abadi, Kecamatan Muara Badak-Anggana, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur |
Abstract
PDF (Bahasa Indonesia)
|
Andres Melbaral, Dedi Yulhendra |
|
Vol 3, No 2 (2018): Journals Mining Engineering: Bina Tambang |
ESTIMASI CADANGAN INSITU MELALUI KEGIATAN INPIT DRILL PADA BUKIT EVEREST, CHEROKEE, DAN STRADA DI PT ANTAM (Persero) Tbk UBPN SULTRA |
Abstract
PDF
|
Fathonie Yurnia H, Mulya Gusman, Adree Octova |
|
Vol 7, No 1 (2022): Journals Mining Engineering: Bina Tambang |
Estimasi Sumber Daya Bijih Besi Menggunakan Metode Inverse Distance Weighted dan Ordinary Kriging di PT.KUATASSI, Kabupaten Solok, Sumatera Barat |
Abstract
PDF (Bahasa Indonesia)
|
Muhammad Rizky, Dedi Yulhendra |
|
101 - 125 of 348 Items |
<< < 1 2 3 4 5 6 7 8 9 10 > >> |