|
Issue |
Title |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Assessment of Productivity and Compatibility of Komatsu PC 2000 Loader and Komatsu HD 785 Transport Equiptment in Overburden Stripping Activities in the North Pit of Muara Tiga Besar Mining Area at PT. Bukit Asam, Tbk. Tanjung Enim, South Sumatra |
Abstract
PDF
|
Putra Alfarizi, Heri Prabowo |
|
Vol 2, No 1 (2015): Journals Mining Engineering: Bina Tambang |
BIAYA PRODUKSI ALAT MUAT DAN ALAT ANGKUT PADA KEGIATAN PENGUPASAN OVERBURDEN PENAMBANGAN BATUBARA DI PT. KARBINDO ABESYAPRADHI |
Abstract
PDF
|
Toni Mayyondra, Murad Murad, Fadhilah Fadhilah |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Calculation of Coal Resources Using the Circular Method at PT Manggala Alam Lestari Bayung Lencir |
Abstract
PDF
|
Rolitu Rolitu, Mulya Gusman |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Calculation of Runoff Discharge in the Coal Mining Open Pit Mine Conveyance System at PT. Kalimantan Prima Persada Jobsite PELH Kebur Village, West Merapi District, Lahat Regency, South Sumatra Province |
Abstract
PDF
PDF
|
Fajar Rofiescha, Rusli HAR, Heri Prabowo |
|
Vol 3, No 1 (2018): Journals Mining Engineering: Bina Tambang |
Characteristic Analysis of Coal Oil Mixture as Alternative Diesel Fuel from Low Rank Coal at PT.Nusa Alam Lestari Site Sinamar Dharmasraya Sumatera Barat |
Abstract
PDF
|
Deni Syahputra, Rijal Abdullah, Yunasril Yunasril |
|
Vol 6, No 2 (2021): Journals Mining Engineering: Bina Tambang |
Deashing Pada Batubara Menggunakan KOH dan HNO3 Sebagai Leaching Agent |
Abstract
PDF
|
Hendly Syahputra Pratama, Fadhilah Fadhilah |
|
Vol 8, No 2 (2023): Journals Mining Engineering: Bina Tambang |
Desain Dan Penjadwalan Produksi Pit Tambang Batubara CV. Niska, Dusun Senamat, Kecamatan Pelepat, Kabupaten Bungo, Provinsi Jambi |
Abstract
PDF (Bahasa Indonesia)
|
Yudha Kurnia Isti |
|
Vol 8, No 1 (2023): Journals Mining Engineering: Bina Tambang |
Desain Optimalisasi dan Penjadwalan Produksi Penambangan Batubara Pada Pit Granit Extend Seam 6 PT. Cipta Bersama Sukses Desa Beji Mulyo Provinsi Sumatera Selatan |
Abstract
PDF (Bahasa Indonesia)
|
Ravilqi Medri, Mulya Gusman |
|
Vol 9, No 2 (2024): Journals Mining Engineering: Bina Tambang |
Desain Penimbunan dan Biaya Penimbunan in Pit Dump X PT Pengembangan Investasi Riau, Desa Pematang Benteng, Kabupaten Indragiri Hulu, Riau |
Abstract
PDF (Bahasa Indonesia)
|
Rahma Shabrina Lubis, Heri Prabowo |
|
Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang |
Desulfurisasi Batubara dengan Metode Leaching Menggunakan Pelarut Asam Klorida (HCl) |
Abstract
PDF
|
Syafril Maidi, Yunasril Yunasril |
|
Vol 6, No 2 (2021): Journals Mining Engineering: Bina Tambang |
Efektifitas Pemanfaatan Sumur Resapan dan Biopori sebagai Artificial Recharge untuk Meresapkan Air Hujan ke dalam Lapisan Akuifer Dangkal pada DAS Batang Kuranji Kota Padang |
Abstract
PDF
|
Alviansyah Alviansyah, Rusli HAR |
|
Vol 9, No 2 (2024): Journals Mining Engineering: Bina Tambang |
Effect of Water and Chemical Spray on Quality Parameters TM, Ash, and CV of E4700 Product Coal at PT Adaro Indonesia Site Kelanis, South Barito Regency, Central Kalimantan |
Abstract
PDF
|
Rinaldi Suntana, Heri Prabowo |
|
Vol 4, No 2 (2019): Journals Mining Engineering: Bina Tambang |
Efisiensi Produktivitas Peralatan Tambang Untuk Mencapai Target Produksi Area (412 Ha) PT. Semen Padang (Persero) Tbk |
Abstract
PDF
|
Hendra Pratama, Murad Murad |
|
Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang |
Estimasi Biaya dan Evaluasi Kebutuhan Alat Muat dan Alat Angkut Terhadap Efisiensi Penambangan Batubara pada Tambang Terbuka PT. Allied Indo Coal Jaya, Sawahlunto |
Abstract
PDF
|
Nurul Anisa Ardianti, Heri Prabowo |
|
Vol 8, No 1 (2023): Journals Mining Engineering: Bina Tambang |
Estimasi Cadangan Batubara PT. Pancaran Surya Abadi, Kecamatan Muara Badak-Anggana, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur |
Abstract
PDF (Bahasa Indonesia)
|
Andres Melbaral, Dedi Yulhendra |
|
Vol 3, No 2 (2018): Journals Mining Engineering: Bina Tambang |
ESTIMASI CADANGAN INSITU MELALUI KEGIATAN INPIT DRILL PADA BUKIT EVEREST, CHEROKEE, DAN STRADA DI PT ANTAM (Persero) Tbk UBPN SULTRA |
Abstract
PDF
|
Fathonie Yurnia H, Mulya Gusman, Adree Octova |
|
Vol 7, No 1 (2022): Journals Mining Engineering: Bina Tambang |
Estimasi Sumber Daya Bijih Besi Menggunakan Metode Inverse Distance Weighted dan Ordinary Kriging di PT.KUATASSI, Kabupaten Solok, Sumatera Barat |
Abstract
PDF (Bahasa Indonesia)
|
Muhammad Rizky, Dedi Yulhendra |
|
Vol 8, No 2 (2023): Journals Mining Engineering: Bina Tambang |
Estimasi Sumberdaya Batubara Dengan Menggunakan Metode Ordinary Kriging di CV. NISKA Dusun Senamat, Kecamatan Pelepat, Kabupaten Bungo, Provinsi Jambi |
Abstract
PDF (Bahasa Indonesia)
|
iskandar iskandar, Mulya Gusman |
|
Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang |
Estimasi Sumberdaya Batubara Menggunakan Perbandingan Metode Polygon Dan Cross Section Di Pit I Pt. Atoz Nusantara Mining, Pesisir Selatan, Sumatera Barat |
Abstract
PDF
|
Muhamadinda Debeno Habibie, Heri Prabowo |
|
Vol 7, No 2 (2022): Journals Mining Engineering: Bina Tambang |
Estimasi Sumberdaya Batubara Pada Pit Timur, PT. Allied Indo Coal Jaya, Kota Sawahlunto, Sumatera Barat |
Abstract
PDF (Bahasa Indonesia)
|
Muhammad Faiz, Dedi Yulhendra |
|
Vol 1, No 1 (2014): Journals Mining Engineering: Bina Tambang |
ESTIMASI SUMBERDAYA BATUBARA TERUKUR DI BLOK TIMUR IUP PT. SAROLANGUN PRIMA COAL, KABUPATEN SAROLANGUN, JAMBI |
Abstract
PDF
|
Icksan Lingga Pradana, Raimon Kopa, Dedi Yulhendra |
|
Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang |
Estimasi Sumberdaya Terukur Batukapur pada Area Bukit Tajarang dengan Menggunakan Metode Indicator Krigging di Tambang Quary PT. Semen Padang, Sumatera Barat |
Abstract
PDF
|
Mhd Zanil, Dedi Yulhendra |
|
Vol 4, No 1 (2019): Journals Mining Engineering: Bina Tambang |
Evaluasi & Analisis Rencana Perubahan Jalur Ventilasi Untuk Kebutuhan Lubang Pendididikan Tambang Bawah Tanah Ombilin 1 (Sawahluwung) PT. Bukit Asam Tbk - UPO |
Abstract
PDF
|
Akman Syarif, Bambang Heriyadi |
|
Vol 7, No 2 (2022): Journals Mining Engineering: Bina Tambang |
Evaluasi Dan Penyesuaian Sistem Ventilasi Pada Tambang Batubara Bawah Tanah Lubang SD-C2 Manual PT. Nusa Alam Lestari Kecamatan Talawi kota Sawahlunto Provinsi Sumatera Barat |
Abstract
PDF (Bahasa Indonesia)
|
khazana tulistra, mulya gusman |
|
Vol 7, No 1 (2022): Journals Mining Engineering: Bina Tambang |
Evaluasi dan Perancangan Sistem Ventilasi Pada Lubang Tambang Batubara BT 03 Site Bukit Tambun, PT. Nusa Alam Lestari, Desa Salak, Kecamatan Talawi, Kota Sawahlunto |
Abstract
PDF (Bahasa Indonesia)
|
Naufal Deya Al Mafaza Mufti, Bambang Heriyadi |
|
101 - 125 of 333 Items |
<< < 1 2 3 4 5 6 7 8 9 10 > >> |