The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


Abstract. Determination of the mining geometry in the room and pillar underground mining method is a fairly complex job. This research was conducted by analyzing the stress on the coal pillar and the coal pillar strength to obtain its safety faktor. Stress determination on the pillars is calculated based on the theory of tributary area loading with the stress working on the pillars is 6.775 MPa. Meanwhile, the coal pillar strength is obtained using empirical equations with the pillar strength of 17.6 MPa. Thus, the pillar safety faktor based on analytical calculations is 2.62 (stable) with mining recovery around 40%. Rock mass characterization is carried out based on rock mass classification Rock Mass Rating (RMR) System. The value of the RMR for coal is 56, where this rock is included in class III rock with a stand up time recommendation for 580 hours and maximum span 6.5 m. Modeling using Phase2 shows the direction of stress transfer tends to be centered on the mining blok area with average mean stress 4.2 MPa and strength factor 2.53. Evaluation of mining geometry is obtained through simulation calculations for several pillar sizes with the results in the form of recommendations for the ideal pillar dimensions 7 m x 7 m with estimated recovery around 55% and safety faktor 1.53.

Keywords:  Pillar Dimensions, Tributary Area, Safety Faktor, Recovery, RMR System