| |
| Issue |
Title |
| |
| Vol 7, No 3 (2022): Journals Mining Engineering: Bina Tambang |
ANALISIS PENGARUH GEOMETRI JALAN PIT MAJAPAHIT BESERTA TOTAL RESISTANCE TERHADAP SPEED DAN FUEL RATIO KOMATSU HD 785-7 PT. KALIMANTAN PRIMA PERSADA SITE PCN DESA SEBAMBAN KEC. SUNGAI LOBAN KAB. TANAH BUMBU KALIMANTAN SELATAN |
Abstract
PDF (Bahasa Indonesia)
|
|
Lukman Firmansyah, Yoszi Mingsi Anaperta |
| |
| Vol 9, No 2 (2024): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Geometri Jalan Pit Section A Beserta Total Resistance Terhadap Speed dan Fuel Consumption Dump Truck Terex TR50D di PT XYZ |
Abstract
PDF (Bahasa Indonesia)
|
|
Fajar Muliardi, Mulya Gusman |
| |
| Vol 6, No 4 (2021): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Geometri Peledakan Terhadap Fragmentasi Hasil Peledakan Dan Digging time Alat Gali Muat Backhoe Caterpillar 6030 Pada Area Pit Limit PT. Semen Padang, Indarung, Provinsi Sumatera Barat |
Abstract
PDF (Bahasa Indonesia)
|
|
Muhammad Tareq Adha, Raimon Kopa |
| |
| Vol 6, No 3 (2021): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Geometri Peledakan Terhadap Fragmentasi Hasil Peledakan Limestone Pada PT. Semen Padang, Kota Padang. |
Abstract
PDF (Bahasa Indonesia)
|
|
Laju Boy Ardi Harahap, Dedi - Yulhendra |
| |
| Vol 6, No 1 (2021): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Geometri Peledakan Terhadap Fragmentasi Hasil Peledakan Serta Digging Time Dan Produktivitas Alat Gali Muat Pada Tamka PT. Allied Indo Coal Jaya, Kota Sawahlunto |
Abstract
PDF (Bahasa Indonesia)
|
|
Rahadiyan Malvin Sunyoto, Raimon Kopa |
| |
| Vol 4, No 1 (2019): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Kecepatan Aliran Udara Terhadap Penurunan Temperatur Efektif Pada Alat Simulasi Ventilasi Tambang Bawah Tanah |
Abstract
PDF
|
|
Dhoni Syaputra, Bambang Heriyadi |
| |
| Vol 8, No 3 (2023): Journals Mining Engineering: Bina Tambang |
ANALISIS PENGARUH KECEPATAN BELT CONVEYOR JALUR 7.1 TERHADAP PRODUKTIVITAS LIMESTONE KE STORAGE PABRIK INDARUNG VI DI PT SEMEN PADANG. |
Abstract
PDF (Bahasa Indonesia)
|
|
Muhammad Fajar Rahman, Dedi Yulhendra |
| |
| Vol 3, No 3 (2018): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Parameter Geomekanika Batuan Terhadap Kegiatan Peledakan Pada Front Penambangan Blok A2 di CV. Triarga Nusatama, Kecamatan Lareh Sago Halaban, Kabupaten Lima Puluh Kota, Sumatera Barat |
Abstract
PDF
|
|
Riki Rinaldo, Bambang Heriyadi, Heri Prabowo |
| |
| Vol 3, No 4 (2018): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Parameter Konduktivitas, Resistivitas dan TDS Terhadap Salinitas Air Tanah Dangkal pada Kondisi Air Laut Pasang dan Air Laut Surut di Daerah Pesisir Pantai Kota Padang |
Abstract
PDF
|
|
Khairunnas Khairunnas, Mulya Gusman |
| |
| Vol 6, No 5 (2021): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Pemasangan Kisi Beton (Concrete Crib) Sebagai Perkuatan Lereng Terhadap Kestabilan Lereng Dengan Menggunakan Metode Kesetimbangan Batas Di PT. Dairi Prima Mineral Kabupaten Dairi Provinsi Sumatera Utara |
Abstract
PDF (Bahasa Indonesia)
|
|
Wiwik Windasari B Manalu, Rizto Salia Zakri |
| |
| Vol 5, No 1 (2020): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Pemberian Cangkang Kelapa Sawit Terhadap Nilai Parameter Batubara |
Abstract
PDF
|
|
Alwa MHD Tanza Al-alang, Fadhilah Fadhilah |
| |
| Vol 6, No 1 (2021): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Pemberian Cangkang Kemiri Terhadap Nilai Parameter Batubara di CV. Bara Mitra Kencana, Sawahlunto |
Abstract
PDF
|
|
Ilal Fajri Setiawan, Heri Prabowo |
| |
| Vol 3, No 2 (2018): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Pengaturan Close Side Setting (CSS) Cone Crusher Terhadap Kapasitas Produksi Dalam Meningkatkan Produk Split 1-2 CM Pada Tambang Andesit PT. Koto Alam Sejahtera |
Abstract
PDF
|
|
Anisa Rahmi, Syamsul Bahri, Murad Murad |
| |
| Vol 6, No 5 (2021): Journals Mining Engineering: Bina Tambang |
ANALISIS PENGARUH PERKUATAN WIRE MESH TERHADAP KEKUATAN PILAR DI TAMBANG BAWAH TANAH DENGAN PENGUJIAN SKALA LABORATORIUM |
Abstract
PDF (Bahasa Indonesia)
|
|
Aldo Azzana Zuhuri, Raimon Kopa |
| |
| Vol 2, No 1 (2015): Journals Mining Engineering: Bina Tambang |
ANALISIS PENGARUH PERUBAHAN NILAI HARGA ACUAN BATUBARA TERHADAP KELAYAKAN PENAMBANGAN TAMBANG BAWAH TANAH OMBILIN 1 (SAWAHLUWUNG) PT. BUKIT ASAM – UPO |
Abstract
PDF
|
|
Yolanda Noverista, Murad Murad, Bambang Heriyadi |
| |
| Vol 4, No 3 (2019): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Perubahan Nilai Total Moisture, Ash Content dan Total Sulphur Terhadap Nilai Kalori Batubara Bb-50 Di Tambang Banko Barat Pt. Bukit Asam, Tbk. Tanjung Enim Sumatera Selatan |
Abstract
PDF
|
|
Muhammad Agil Fadhili, Ansosry Ansosry |
| |
| Vol 8, No 3 (2023): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Powder Factor Terhadap Hasil Fragmentasi PT. Allied Indo Coal Jaya Sawahlunto Sumatera Barat |
Abstract
PDF (Bahasa Indonesia)
|
|
Afni Nelvi |
| |
| Vol 8, No 1 (2023): Journals Mining Engineering: Bina Tambang |
Analisis Pengaruh Speed Terhadap Fuel Ratio Alat Angkut Sany SKT90S-35 Pada Kegiatan Pengupasan Overburden Pit South di PT. Anugerah Covindo Indonesia |
Abstract
PDF (Bahasa Indonesia)
|
|
Heri Permana, Yoszi Mingsi Anaperta |
| |
| Vol 6, No 1 (2021): Journals Mining Engineering: Bina Tambang |
ANALISIS PENGGUNAAN SISTEM APLIKASI e-PNBP TERHADAP PENGELOLAAN PNBP DI DIREKTORAT JENDERAL MINERAL DAN BATUBARA KEMENTERIAN ESDM |
Abstract
PDF
|
|
Rio Eka Putra, Murad Murad, Fadhillah Fadhillah |
| |
| Vol 5, No 5 (2020): Journals Mining Engineering: Bina Tambang |
Analisis Pengurangan Getaran Tanah (Ground Vibration) Hasil Peledakan Overburden Di Pit Agathis PT Kalimantan Prima Persada Jobsite HJUR, Rantau, Kalimantan Selatan |
Abstract
PDF (Bahasa Indonesia)
|
|
Yulia Minara, Dedi Yulhendra |
| |
| Vol 2, No 1 (2015): Journals Mining Engineering: Bina Tambang |
ANALISIS PENURUNAN SUHU UDARA DI AREA PRODUKSI TAMBANG BATUBARA BAWAH TANAH PT. BUKIT ASAM (PERSERO) TBK, UNIT PENAMBANGAN OMBILIN, SAWAHLUNTO, SUMATERA BARAT |
Abstract
PDF
|
|
Fedi Fedi, Bambang Heriyadi, Yoszi Mingsi Anaperta |
| |
| Vol 3, No 3 (2018): Journals Mining Engineering: Bina Tambang |
Analisis Penyanggaan Berdasarkan Karakteristik Batuan Pada Atap dan Dinding Lubang Tambang Batubara Bawah Tanah BMK-04 di CV. Bara Mitra Kencana, Kecamatan Talawi, Sawahlunto |
Abstract
PDF
|
|
Wahyu Eko Prasetianto, Bambang Heriyadi |
| |
| Vol 5, No 3 (2020): Journals Mining Engineering: Bina Tambang |
Analisis Perbandingan Biaya Alat Gali Muat Excavator Komatsu PC 1250 dengan Excavator Hitachi ZX 1200 Pada Pengupasan Overbarden Di PT. Artamulia Tatapratama |
Abstract
PDF
|
|
Ichsan Achmad Setiawan, Yoszi Mingsi Anaperta |
| |
| Vol 1, No 2 (2014): Journals Mining Engineering: Bina Tambang |
ANALISIS PERBANDINGAN BIAYA PENGGUNAAN ALAT ANGKUT RDT TEREX TR60 DENGAN RDT EUCLID R60 PADA PENAMBANGAN OVERBURDEN DI PIT E UTARA PT. KARBINDO ABESYAPRADHI |
Abstract
PDF
|
|
Prismark Dhonald Mirzha, Murad Murad, Fadhilah Fadhilah |
| |
| Vol 3, No 3 (2018): Journals Mining Engineering: Bina Tambang |
Analisis Perbandingan Campuran Batubara dengan Serbuk Kayu dalam Memanfaatkan Batubara Kalori Rendah di PT. Atoz Nusantara Mining Nagari Tambang IV Jurai Pasisir Selatan |
Abstract
Untitled
|
|
Al Afdil Fadli, Murad Murad |
| |
| 151 - 175 of 631 Items |
<< < 2 3 4 5 6 7 8 9 10 11 > >> |