| |
| Issue |
Title |
| |
| Vol 8, No 2 (2023): Journals Mining Engineering: Bina Tambang |
Studi Kelayakan Investasi Pengadaan Loader Dan Hauler Untuk Alternatif Beli Langsung Pada Kegiatan Coal Hauling Dari Rom PIT Ke Rom Port PT. MNC Infrastruktur Utama Jobsite PT. Bhumi Sriwijaya Perdana Coal, Provinsi Sumatera Selatan |
Abstract
PDF (Bahasa Indonesia)
|
|
wahyuzanora wahyuzanora, Tri Gamela Saldy |
| |
| Vol 7, No 3 (2022): Journals Mining Engineering: Bina Tambang |
Studi Optimasi Produksi Alat Gali Muat dan Alat Angkut Pada Kegiatan Pengupasan Overburden Menggunakan Metode Match Factor Berdasarkan Efisiensi Biaya Operasional Di Pit Eagle 3 PT. Bumi Karya Makmur, Job Site PT. IPC, Bantuas, Kota Samarinda, Provinsi Kalimantan Timur |
Abstract
PDF (Bahasa Indonesia)
|
|
Joko Handayani, Try Gamela Saldy |
| |
| Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang |
Studi Optimasi Produktivitas Alat Gali Muat dan Alat Angkut Menggunakan Metode Linear Programming Pada Perolehan Produksi Overburden PT. Surya Global Makmur Jobsite Pemusiran, Kabupaten Sarolangun, Provinsi Jambi |
Abstract
PDF
|
|
Adinda Adinda, Dedi Yulhendra |
| |
| Vol 4, No 1 (2019): Journals Mining Engineering: Bina Tambang |
Studi Penempatan Sumur Resapan Berdasarkan Nilai Laju Infiltrasi, Kualitas Fisik Air, dan Tekstur Tanah pada DAS Air Dingin dan Batang Kandis Bagian Tengah-Hilir, Kota Padang |
Abstract
PDF
|
|
Rizka Mutiara, Rusli HAR |
| |
| Vol 6, No 1 (2021): Journals Mining Engineering: Bina Tambang |
Studi Penempatan Sumur Resapan Berdasarkan Nilai Laju Infiltrasi, Kualitas Fisik Air, dan Tekstur Tanah pada DAS Air Timbalun dan Sungai Pisang Di Kota Padang |
Abstract
PDF (Bahasa Indonesia)
|
|
Fajar Inaqtiyo Zalaff, Rusli HAR |
| |
| Vol 5, No 4 (2020): Journals Mining Engineering: Bina Tambang |
Studi Penempatan Sumur Resapan Berdasarkan Nilai Laju Infiltrasi, Kualitas Fisik Air, dan Tekstur Tanah pada DAS Air Timbalun dan Sungai Pisang Kota Padang |
Abstract
PDF
|
|
Fajar Inaqtiyo, Rusli HAR |
| |
| Vol 4, No 1 (2019): Journals Mining Engineering: Bina Tambang |
Studi Penempatan Sumur Resapan Berdasarkan Nilai Laju Infiltrasi, Kualitas Fisik Air dan Tekstur Tanah pada DAS Batang Arau Kota Padang |
Abstract
PDF (Bahasa Indonesia)
|
|
Dicky Maryand, Rusli HAR |
| |
| Vol 6, No 1 (2021): Journals Mining Engineering: Bina Tambang |
Studi Penempatan Sumur Resapan Berdasarkan Nilai Laju Infiltrasi, Kualitas Fisik Air dan Tekstur Tanah pada DAS Batang Kuranji Kota Padang |
Abstract
PDF
|
|
Muhammad Fadli, Rusli HAR |
| |
| Vol 8, No 1 (2023): Journals Mining Engineering: Bina Tambang |
STUDI PENERAPAN SISTEM MANAJEMEN KESELAMATAN PERTAMBANGAN PT. DEMPO MAJU CEMERLANG |
Abstract
PDF (Bahasa Indonesia)
|
|
Dipo Hadi Rahmawijaya, Fadhilah Fadhilah |
| |
| Vol 7, No 2 (2022): Journals Mining Engineering: Bina Tambang |
Studi Potensi Bahan Galian Pasir-Kerakal di Sungai Titian Panjang, Kecamatan Lembah Gumanti, Kabupaten Solok, Provinsi Sumatera Barat |
Abstract
PDF (Bahasa Indonesia)
|
|
Ikras Fadli Ramadhani Eye, Harizona Aulia Rahman, heri pra bowo |
| |
| Vol 3, No 1 (2018): Journals Mining Engineering: Bina Tambang |
STUDI TENTANG KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PERTAMBANGAN EMAS RAKYAT DI KENAGARIAN PALANGKI KECAMATAN IV NAGARI KABUPATEN SIJUNJUNG |
Abstract
PDF
|
|
Zhilal Darma, Yunasril Yunasril, Bambang Heriyadi |
| |
| Vol 7, No 2 (2022): Journals Mining Engineering: Bina Tambang |
STUDI TINGKAT KEBISINGAN DI AREA LIMESTONE CRUSHER VI (LSC VI) DI PT.SEMEN PADANG |
Abstract
PDF (Bahasa Indonesia)
|
|
Gilang Haris Prasetyo, Dr. Fadhila S.Pd,.M.Si, tri gamela saldy,S.T.,M.T |
| |
| Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Study of the Effectiveness of Loading Digging Tools for Doosan SL 500 Excavators and Komatsu 300 Excavators Using the Overall Equipment Effectiveness (OEE) Method to Achieve Over Burden Stripping Targets at PT. Hasta Panca Mandiri Utama Job Site Cita Mine |
Abstract
PDF
|
|
Bimo Elang Putra, Dedi Yulhendra |
| |
| Vol 9, No 2 (2024): Journals Mining Engineering: Bina Tambang |
Tambang Batubara Terbuka PT Bima Putra Abadi Citranusa (BPAC) (Evaluasi Geometri Jalan Segment Inpit Dump Sidewall Pit BPAC) |
Abstract
PDF (Bahasa Indonesia)
|
|
Daffa Imammuti, Jukepsa Andas |
| |
| Vol 4, No 1 (2019): Journals Mining Engineering: Bina Tambang |
The Planning of Supply Requirments for Heavy Equipments and Costs Coal Mine to Reach The Production Target at Langkok Pit 1 Site PTBA UPO (Persero) Tbk, West Sumatra On 2017. |
Abstract
PDF
|
|
Nuzul Sandria Sasra, Murad Murad |
| |
| Vol 3, No 4 (2018): Journals Mining Engineering: Bina Tambang |
Tinjauan Sistem dan Kinerja Manajemen Keselamatan & Kesehatan Kerja Tambang Bawah Tanah CV. Tahiti Coal, Talawi, Sawahlunto, Sumatera Barat |
Abstract
PDF
|
|
Rika Almaida Simanjuntak, Rijal Abdullah |
| |
| Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang |
Upaya Meminimalisir Kecelakaan Kerja di Area Penambangan PT. Adaro Services Job Site Binungan, Berau Provinsi Kalimantan Timur |
Abstract
PDF
|
|
Hafidz Haidi, Rijal Abdullah |
| |
| Vol 4, No 3 (2019): Journals Mining Engineering: Bina Tambang |
Upaya Meminimalisir Kecelakaan Kerja Di Area Penambangan PT. Prima Sarana Gemilang Jobsite Muara Alam Sejahtera, Kabupaten Lahat, Provinsi Sumatera Selatan |
Abstract
PDF
Untitled
|
|
Tomy Efraim Situmorang, Rijal Abdullah |
| |
| Vol 4, No 1 (2019): Journals Mining Engineering: Bina Tambang |
Upaya Meminimalisir Kecelakaan Kerja di Area Penambangan PT. Putra Perkasa Abadi jobsite Borneo Indobara, Kabupaten Tanah Bumbu, Kalimantan Selatan |
Abstract
PDF
|
|
Septiadi Budiyanto, Rijal Abdullah |
| |
| Vol 3, No 1 (2018): Journals Mining Engineering: Bina Tambang |
UPGRADING COAL LOW QUALITY WITH DRYING PROCESS WITHOUT OXYGEN |
Abstract
PDF
|
|
Joni Pradinata, Rijal Abdullah, Ansosry Ansosry |
| |
| Vol 4, No 4 (2019): Journals Mining Engineering: Bina Tambang |
Variasi Waktu Terhadap Penyerapan Merkuri (Hg) Oleh Eceng Gondok (Eichhornia crassipes) (Studikasus: Air Danau Bekas PETI di Jorong Jujutan, Nagari Lubuk Gadang, Kecamatan Sangir, Kabupaten Solok Selatan. |
Abstract
PDF
|
|
Fauzi Deswandri, Fadhillah Fadhillah |
| |
| Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang |
Work Compatibility of Excavator Komatsu PC400 with Hino 500 FM 320 TI Transport Equipment in Coal Mining Activities in North Pit Muara Tiga Besar 1 PT Bukit Asam, Tbk.Tanjung Enim, South Sumatra. |
Abstract
PDF
|
|
Muhammad Fajar Ramadhan, Dedi Yulhendra |
| |
| 601 - 622 of 622 Items |
<< < 20 21 22 23 24 25 |