|
Issue |
Title |
|
Vol 5, No 2 (2020): JURNAL BINA TAMBANG |
Upaya Meminimalisir Kecelakaan Kerja di Area Penambangan PT. Adaro Services Job Site Binungan, Berau Provinsi Kalimantan Timur |
Abstract
PDF
|
Hafidz Haidi, Rijal Abdullah |
|
Vol 4, No 3 (2019): JURNAL BINA TAMBANG |
Upaya Meminimalisir Kecelakaan Kerja Di Area Penambangan PT. Prima Sarana Gemilang Jobsite Muara Alam Sejahtera, Kabupaten Lahat, Provinsi Sumatera Selatan |
Abstract
PDF
Untitled
|
Tomy Efraim Situmorang, Rijal Abdullah |
|
Vol 4, No 1 (2019): JURNAL BINA TAMBANG |
Upaya Meminimalisir Kecelakaan Kerja di Area Penambangan PT. Putra Perkasa Abadi jobsite Borneo Indobara, Kabupaten Tanah Bumbu, Kalimantan Selatan |
Abstract
PDF
|
Septiadi Budiyanto, Rijal Abdullah |
|
Vol 3, No 1 (2018): Jurnal Bina Tambang |
UPGRADING COAL LOW QUALITY WITH DRYING PROCESS WITHOUT OXYGEN |
Abstract
PDF
|
Joni Pradinata, Rijal Abdullah, Ansosry Ansosry |
|
Vol 4, No 4 (2019): JURNAL BINA TAMBANG |
Variasi Waktu Terhadap Penyerapan Merkuri (Hg) Oleh Eceng Gondok (Eichhornia crassipes) (Studikasus: Air Danau Bekas PETI di Jorong Jujutan, Nagari Lubuk Gadang, Kecamatan Sangir, Kabupaten Solok Selatan. |
Abstract
PDF
|
Fauzi Deswandri, Fadhillah Fadhillah |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Jurnal Bina Tambang |
Work Compatibility of Excavator Komatsu PC400 with Hino 500 FM 320 TI Transport Equipment in Coal Mining Activities in North Pit Muara Tiga Besar 1 PT Bukit Asam, Tbk.Tanjung Enim, South Sumatra. |
Abstract
PDF
|
Muhammad Fajar Ramadhan |
|
576 - 581 of 581 Items |
<< < 19 20 21 22 23 24 |