The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


PT. Semen Padang is a mining company that uses the open pit mining method, namely Quarry Side Hill mining, which is a mining method carried out to excavate deposits of industrial minerals or non-metallic minerals. The rock to be transported to the crusher must be blasted first. The results of field observations of the actual blasting geometry applied by the company obtained fragmentation of boulder-sized blasting results with a percentage of ±31%. The large percentage of boulder causes the diggability of the digging tool to be not optimal, where the digging time of the digging tool is not according to the company's target of below 12 seconds. This study aims to design the optimum blasting geometry to reduce the percentage of boulder so that loading activities become effective and the diggability of the digging tool increases. The research method is carried out by providing recommendations for blasting geometry based on the methods of C.J Konya and R.L. Ash. The proposed geometry applied in the field is: burden: 3 m, spacing of 3.5 m, stemming: 3 m, subdrilling: 1 m, ladder height: 8 m, blast hole depth: 9 m, powder column: 6 m, and powder factor : 0.26 kg/ton, where the boulder size fragmentation resulting from the analysis is 11.92%.