|
Issue |
Title |
|
Vol 7, No 2 (2022): Journals Mining Engineering: Jurnal Bina Tambang |
STUDI TINGKAT KEBISINGAN DI AREA LIMESTONE CRUSHER VI (LSC VI) DI PT.SEMEN PADANG |
Abstract
PDF (Bahasa Indonesia)
|
Gilang Haris Prasetyo, Dr. Fadhila S.Pd,.M.Si, tri gamela saldy,S.T.,M.T |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Jurnal Bina Tambang |
Study of the Effectiveness of Loading Digging Tools for Doosan SL 500 Excavators and Komatsu 300 Excavators Using the Overall Equipment Effectiveness (OEE) Method to Achieve Over Burden Stripping Targets at PT. Hasta Panca Mandiri Utama Job Site Cita Mine |
Abstract
PDF
|
Bimo Elang Putra, Dedi Yulhendra |
|
Vol 9, No 2 (2024): Journals Mining Engineering: Jurnal Bina Tambang |
Tambang Batubara Terbuka PT Bima Putra Abadi Citranusa (BPAC) (Evaluasi Geometri Jalan Segment Inpit Dump Sidewall Pit BPAC) |
Abstract
PDF (Bahasa Indonesia)
|
Daffa Imammuti, Jukepsa Andas |
|
Vol 4, No 1 (2019): Journals Mining Engineering: Jurnal Bina Tambang |
The Planning of Supply Requirments for Heavy Equipments and Costs Coal Mine to Reach The Production Target at Langkok Pit 1 Site PTBA UPO (Persero) Tbk, West Sumatra On 2017. |
Abstract
PDF
|
Nuzul Sandria Sasra, Murad Murad |
|
Vol 5, No 2 (2020): Journals Mining Engineering: Jurnal Bina Tambang |
Upaya Meminimalisir Kecelakaan Kerja di Area Penambangan PT. Adaro Services Job Site Binungan, Berau Provinsi Kalimantan Timur |
Abstract
PDF
|
Hafidz Haidi, Rijal Abdullah |
|
Vol 4, No 1 (2019): Journals Mining Engineering: Jurnal Bina Tambang |
Upaya Meminimalisir Kecelakaan Kerja di Area Penambangan PT. Putra Perkasa Abadi jobsite Borneo Indobara, Kabupaten Tanah Bumbu, Kalimantan Selatan |
Abstract
PDF
|
Septiadi Budiyanto, Rijal Abdullah |
|
Vol 3, No 1 (2018): Journals Mining Engineering: Jurnal Bina Tambang |
UPGRADING COAL LOW QUALITY WITH DRYING PROCESS WITHOUT OXYGEN |
Abstract
PDF
|
Joni Pradinata, Rijal Abdullah, Ansosry Ansosry |
|
Vol 9, No 1 (2024): Journals Mining Engineering: Jurnal Bina Tambang |
Work Compatibility of Excavator Komatsu PC400 with Hino 500 FM 320 TI Transport Equipment in Coal Mining Activities in North Pit Muara Tiga Besar 1 PT Bukit Asam, Tbk.Tanjung Enim, South Sumatra. |
Abstract
PDF
|
Muhammad Fajar Ramadhan |
|
326 - 333 of 333 Items |
<< < 9 10 11 12 13 14 |