Analisis Hasil Uji PMT 150kV Pada Gardu Induk Cilegon Baru BAY KS 1

Didik Aribowo(1),
(1)   Indonesia

Corresponding Author


DOI : https://doi.org/10.24036/jtev.v5i1.1.106147

Full Text:    Language : en

Abstract


In this modern era, the need for electricity has become a primary need in both big cities and small cities, almost all of our daily life support equipment requires electrical energy. PLN as the only company engaged in the distribution of electrical energy researches in the field of maintenance, especially testing of PMT insulation prisoners. Based on IEV (International Electrotechnical Vocabulary) 441-14-20 stated that Circuit Breaker (CB) is a mechanical switching / switching equipment, which is able to close, drain and break the load current under normal conditions and is able to close, drain ( within a certain time period) and break the load current under specific abnormal conditions / disturbances such as short circuits. to be used as material for the PMT analysis. The minimum PMT isolation resistance limit at the operating temperature is calculated "1 kV = 1 MΩ". with a note of 1 kv = the magnitude of the phase voltage to the ground, allowable leakage current per kV = 1mA.

Keywords


Analysis, PMT, Substation

References


Dr.S Kuahara. Dr.A.Arismunandar, 1997, Teknik Tenga Listrik Jilid III, PT. Pradnya Paramita.

Hazairin, 2004,Dasar-dasar sistem proteksi tenaga listrik,. UNSRI

Ir. Kadir Abdul. 1998, Transmisi Tenaga Listrik. Universitas Indonesia.

PT. PLN (Persero), 2014.Sistem Proteksi, Udiklat Palembang

Zuhal, 1991, Dasar tenaga listrik. Penerbit ITB. Bandung..

William D.stevenson, 1994. Analisa sistem tenaga listrik.

PLN PUSDIKLAT. 2011. BUKU PETUNJUK PEMUTUS TENAGA (PMT) Jakarta, Penerbit PLN PUSDIKLAT.

PLN P3B JB.2010. INSTRUKSI KERJA TAHANAN ISOLASI. Jakarta, Penerbit PLN P3B


Article Metrics

 Abstract Views : 2152 times
 PDF Downloaded : 1006 times

Refbacks

  • There are currently no refbacks.