How to cite (IEEE):
R. A.M, A. Arnellis, & R. Sriningsih
"Optimasi Hasil Produksi Tahu dan Tempe dengan Metode Branch and Bound dan Metode Cutting Plane," Journal of Mathematics UNP, vol. 3, no. 1, , Dec. 2018.
https://doi.org/10.24036/unpjomath.v3i1.4665
How to cite (APA):
A.M, R., Arnellis, A., & Sriningsih, R.
(2018).
Optimasi Hasil Produksi Tahu dan Tempe dengan Metode Branch and Bound dan Metode Cutting Plane.
Journal of Mathematics UNP, 3(1).
https://doi.org/10.24036/unpjomath.v3i1.4665
How to cite (Chicago):
A.M, Raudhatul, Arnellis, Arnellis, AND Sriningsih, Riry.
"Optimasi Hasil Produksi Tahu dan Tempe dengan Metode Branch and Bound dan Metode Cutting Plane" Journal of Mathematics UNP [Online], Volume 3 Number 1 (17 December 2018)
https://doi.org/10.24036/unpjomath.v3i1.4665
How to cite (Vancouver):
A.M R, Arnellis A, & Sriningsih R .
Optimasi Hasil Produksi Tahu dan Tempe dengan Metode Branch and Bound dan Metode Cutting Plane.
Journal of Mathematics UNP [Online]. 2018 Dec;
3(1).
https://doi.org/10.24036/unpjomath.v3i1.4665
How to cite (Harvard):
A.M, R., Arnellis, A., & Sriningsih, R.
,2018.
Optimasi Hasil Produksi Tahu dan Tempe dengan Metode Branch and Bound dan Metode Cutting Plane.
Journal of Mathematics UNP, [Online] 3(1).
https://doi.org/10.24036/unpjomath.v3i1.4665
How to cite (MLA8):
A.M, Raudhatul, Arnellis Arnellis, & Riry Sriningsih.
"Optimasi Hasil Produksi Tahu dan Tempe dengan Metode Branch and Bound dan Metode Cutting Plane." Journal of Mathematics UNP [Online], 3.1 (2018): ##plugins.citationFormats.mla.noPages## Web. 21 Nov. 2024
, https://doi.org/10.24036/unpjomath.v3i1.4665
BibTex Citation Data :
@article{