The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


Increased in cement demand for development has made PT. Semen Padang increased its cement production. Increased cement demand means increased demand for limestone as a base material for manufacturing cement. Based on data from PT. Semen Padang, the limestone mining production target in August 2016 was 718,000 tons, while the realization of the production 580,000 tons or about 81% of the production target. To determine the productivity of the loading and hauling equipment it is necessary to do some calculation phases. Up to this time, if the process of calculating the productivity of the equipement is done manually, it will take a long time and less practical. And it is expected that a program that can help with the productivity calculation process.
Production calculation program is programmed using visual basic programming language. This program can be used to calculate the productivity of loading and hauling equipment. After the analysis and calculation done with the program, improving the productivity of the equipment must be done. To improve the productivity of the equipment, an improvement in the work efficiency of the equipment and the bucket fill factor excavator was made.
Calculation results using the program, for the productivity of the loading equipment after the improvement the productivity of dump truck Komatsu HD 785 with Hitachi EX 2500-6 excavator is 721,179.27 tons /month. The calculation results using the program with the manual is not much different. The difference result of the calculation is caused by integrating the numbers behind the comma