The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


Abstract. Based on the Decree of the Minister of Energy and Mineral Resources No. 1827K concerning Guidelines for the Implementation of Good Mining Rules, states that every mining company is required to report a management plan for the remaining reserves in its territory as part of conservation. One of the conservation efforts is to carry out mining of unmined reserves. This can be used to achieve the effectiveness and efficiency of the desired target. This also helps to maintain the availability of coal when certain qualities cannot be met by PT Bukit Asam Tbk. Mining operations basically require design and economic studies to get optimal results. Based on the study that has been carried out, the seam c coal seam in pit 1 north of Banko Barat has the potential to be optimized which produces a coal volume of around 442,769.68 tons with a stripping ratio of 2.9. Based on the study of Break even stripping ratio (BESR), the result is 15.7 with an economical SR of 9.76, it can be concluded that the design that has been designed is feasible to mine because it does not exceed the economical SR.