The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


Abstract. PT. Semen Padang is a limestone mining company located in Bukit Karang Putih, Indarung, Padang City, West Sumatera using the quarry mining method. Production in October 2019 on Front C was 139.590 tons while the production target was 307.440 tons. One of the factors that influence the productivity of the conveyance is the total resistance, namely rolling resistance and grade resistance. The lowest total resistance value when loaded is in the M-20-21 segment at -2,8% while the largest in the M-5-6 segment is -14,1%. The smallest total resistance value when empty is in the M 3-2 segment by 0,47515% while the largest in the M 2-1 segment is 21,5717%. After simulating the total resistance value, the total resistance value obtained when the smallest load is in the M 8-9 segment is -2% while the largest in the 3-4 M segment is 9,3%. The smallest total resistance value when empty is in segments M 20-19 is 15,77%. With the increased productivity of the conveyance from 375.300 tons/hour/ unit with a cycle time of 25,53 minutes to 437.880 tons/ hour/unit with a cycle time of 21,88 minutes.

Keywords: Production, Productivity, Total resistance, Rolling Resistance, Grade Resistance, and Cycle Time