The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


Abstract. PT. Manggala Usaha Manunggal is a contractor company that trusted to do coal mining by PT. Banjarsari Pribumi in Merapi Timur, Lahat Regency, South Sumatera. PT. Manggala Usaha Manunggal using open pit mining method. At the crest area of highwall section B there is the pile of overburden materials. Slope stability analysis using the Monte Carlo probabilistic method, the factor of safety and probability of failure for the recommendation of  slope geometry will be obtained using Bishop Simplified method. As the results are the result of slope stability analysis on highwall section B shown that there is no decrease in slope stability where the value of factor before and after being given additional load is the same, that is 3,017 and the probability of Failure is 0% .