The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


Abstract. Take into account mining optimization by taking into account the NPV value as the main reference factor of the Ultimate Pit Limite (UPL) that is used based on the division of levels obtained by comparing the sale value or the Net Present Value (NPV) of the Laterite Nickel Laterit. Inverse Distance Weighting (IDW) Method. This method is an interpretation method with a simple block model approach by considering the surrounding points. The mining method that will be planned on Front X is an open pit method with a multi-tiered system. At PT ANTAM Tbk. UBPN Sultra makes block model based on division of levels which differentiates each zone. At Ni level <1.3 the layer is classified as waste or called top soil, Ni level <1.5 layer is still called waste or limonite while for the value of Ni level> 1.5 is called ore or saprolite The calculation of the Lerchs Grossmann dimension algorithm is basically the sum of costs and cumulative income in the pit limit. The modeling and calculation of the Grossmann Learch Method can be planned for a more optimal pit shape and in accordance with a more economical mining price. This method is far more complicated and the risk of human error is high to determine which pit is effective. This method considers all aspects.

Keyword: Pit, Ultimate Pit Limit, Net Present Value (NPV), Nikel Laterit, Blok Model