The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


Abstrack Based on the production data limestone minning at existing area of PT. Semen Padang in January-February 2018, limestone mining production did not reach the target. This is due to the low productivity of the dumptruck. To find out the improvement potential of a production process and the effectiveness of using equipment, it is necessary to do an analysis using the Quality Control Circle (QCC) method. After knowing the root of the problem, ideas for improvement are given to obstacles so that production can be achieved. After doing the analysis and improvement with these methods, the production of the komatsu HD 785-7 dumptruck exceeded the planned target. However, for the values of PA, MA, UA and EU, each conveyance is still < 85% has not yet reached the optimal world class value that is > 85%, it can be concluded that the condition of the equipment is not good. It is better to do repairs to standby time and tool breakdown.

 

Keywords: Production, Quality Control Circle, Pareto Diagram, Fishbone Method, komatsu hd 785-7 dumptruck