Abstract


Diesel Powered Electric Generator is a Electric Generator where using Diesel Machine as primer mover, which function to produce mechanical energy required to rotate the rotor generator to produce the electricity. The problem faced is found a lot of damage whice is make engine machine does not operate and high repair costs that result the company suffered losses. Reliability Centered Maintenance is a method where used to find “what should you do” to determine effective treatment. The result Showed that the machine has a major constraint on the machine RUSTON 1 is Injection Pump and Cylinder Linier Infection Pump with maintenance intervals about 44.24 hours. The Failure factor of the engine components are the supply of engine’s fuel is not optimal. Total cost for cumulative maintenance of two critical components reach Rp. 831.263.531.

 

Keywords: Maintenance,  Reliability Centered Maintenance (RCM)