The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


Abstract. PT. Allied Indo Coal Jaya is one of the companies engaged in the coal mining business in the city of Sawahlunto with the status of the Mining Entrepreneurs Cooperation Agreement (PKP2B) in an area of 327.4 hectares. PT. Allied Indo Coal Jaya (PT. AICJ) has a constant production target every month with a target of 294,117.65 BCM / month to produce overburden. However, the realization of overburden excavation production in December did not reach the target of 175,708.73 BCM / month. In 1 fleet there is a loading device serving 3 to 5 unit so that there is a queue conveyance. This shows that the mismatch of loading and hauling equipment is not suitable so that the production and overburden stripping production costs are not optimal. Therefore it is necessary to plan the transportation needs and optimal costs for optimizing overburden production. To solve this, a more complex method is needed, using the Simplex method. Based on the Simplex Method, there are 10 units of dumptruck planning that were previously 13 units. then based on the application of the Linear Programming Method Simplex obtained optimal production obtained for overburden stripping of 277.37 BCM / hour with a production cost of 5.41 USD /BCM.