EVALUASI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PENYELESAIAN PROYEK KONSTRUKSI DENGAN PENDEKATAN ANALYTICAL HIERARCHY PROCESS (AHP) DI KOTA PADANG

Lisa Rahmi - Universitas Negeri Padang
firman firman - Universitas Negeri Padang
Gesit Tabrani - Universitas Negeri Padang

Abstract


This study aims to find out, what are the factors that cause delays in project development in Padang City. The population in this study were several contractors registered as members of GAPENSI Kota Padang. The number of samples is the majority contractor, consisting of 3 intermediate contractors and 5 small contractors. The method used is a cause and effect diagram (fishbone) and Analytical Hierarchy Process (AHP). The results of this study are the main factors that cause delays in the repair of construction projects, namely: (1) delays caused by specifications / design changes with a value of 0.1265, (2) weather and natural disasters with a value of 0.1144, (3 )) error in choosing the construction method with a weight value of 0.0912.

Keywords: Construction Project Delay Factors, Cause-Effect Diagram (Fish Bone), Analytical Hierarchy process (AHP).


Full Text:

PDF

References


Budi Santosa. (2009). Manajemen Proyek: Konsep & Implementasi (1st ed.). Yogyakarta: Graha Ilmu.

Ghiasi vahed, Ebrahim Kaivan, Nima Arzjani, dan D. A. (2017). Analysing the Cause of Delay IN Development projects by Fuzzy Analysis. International Journal of Quality & Reliability Management. https://doi.org/http://dx.doi.org/10.1108/MRR-09-2015-0216

Handayani, R. I., & Darmianti, Y. (2017). Pemilihan Supplier Bahan Baku Bangunan Dengan Metode Analytical Hierarchy Process (AHP) Pada PT . Cipta Nuansa, (1), 1–8.

Heizer, jay, Barry Render, dan C. M. (2017). Operations Management Sustainability and Supply Chain Management. Corporate finance (Twelfth, Vol. 1). new York: PEARSON. https://doi.org/10.1017/CBO9781107415324.004

Kareth, M. (2012). ANALISIS OPTIMALISASI WAKTU DAN BIAYA DENGAN PROGRAM PRIMAVERA 6 . 0 ( Studi Kasus : Proyek Perumahan Puri Kelapa Gading ), 1(1), 53–59.

M, Aziz Abdul, Marthen Riyandi. W, D. R. K., & Hartono, N. (2016). Analisa faktor penyebab keterlambatan progress terkait dengan manajemen waktu, 21, 61–74.

PMBOK. (2004). A Guide to the Project Management Body of Knowledge: PMBOK, Third Edition, v1.2. Newtown Square, Pennsylvania: Project Management institute, inc.

Prof. Dr. Ir. Marimin, M. S. (2004). Teknik dan Aplikasi Pengambilan Keputusan Kriteria Majemuk (1st ed) (1st ed.). Jakarta: Grasindo.

Puruhit, H. W., & , Mamok Suprapto, S. A. (2014). Penyelesaian Proyek Konstruksi ( Studi Kasus : Rosalia Indah Group ), II(2), 72–98.

Render, Barry, Ralph M. Stair, Jr., M. E. H. (2006). Quantitative Analysis For Management (9 Edition) (9th ed.). USA: Pearson Prentice Hall.

Sekaran, U., & Roger Bougie. (2009). Research methods for business. (John Wiley & Sons Ltd, Ed.) (Five editi). United kingdom.

Sharma, Shubham, Mukesh Pandey, S. A. (2017). Ranking of Delay Factors in Construction Project Using AHP and VIKOR Multi-, 6(7), 15404–15409. https://doi.org/10.15680/IJIRSET.2017.0607381

Stiawirawan, H. (2015). Analisis faktor-faktor penyebab keterlambatan pelaksanaan pekerjaan proyek gedung di kota Padang, 1–14

Zolghadri, M., & Vahdani, B. (2015). Identify and prioritize the factors influencing project risk by using AHP & VIKOR Fuzzy ( Case Study : South Pars Gas Complex ), 2015(2), 70–81. https://doi.org/10.5899/2015/acte-00199




DOI: http://dx.doi.org/10.24036/jmpe.v2i1.6092