The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

Abstract


PT. Budi Gema Gempita is one of the coal mining companies operating in East Merapi District, Lahat Regency, South Sumatra. The mining system used is an open pit mining system using the Open Pit Mining method. In carrying out mining operations, there are differences in production results from the data recorded by the checker in the form of truck count data and survey data. The results of the calculation of the volume of overburden material based on survey data obtained a comparison of overburden volume based on survey data and truck count data in June 2021 in the East Section 2 pit on the first week 12,574.22 bcm, second week 28,507.03 bcm, third week 16,415.47 bcm and fourth week 53,958.90 bcm.Due to the difference in the volume of survey data with truck count data, in the conclusion with actual condition of the truck count data in the form of overburden material that is sticky on the vessel dump truck or articulated dump truck being transported back to disposal because the type of material transported is in the form of mud (material containing water), making it difficult to stockpile. Meanwhile, by looking at the survey measurement conditions, there is a fill value that has not been transported to disposal, which is measured again in the survey measurement so that it reduces the cut value.